HDC MidAtlantic began construction of a four-story apartment building on the parking lot directly east of the CMS building in September 2023. The project is expected to be completed before the end of 2024. Throughout the construction, HDC and their contractor, EG Stoltzfus have worked closely with CMS Executive Director Jeff Reed to ensure safety for CMS students, families, and staff, both during and after construction of the apartment building.
Paving and parking line striping of our parking areas are now complete. There is a new one-way flow of traffic in the rear parking area; as you enter from 16th Street, you must keep to the right of the driveway and turn sharply right into the parking lot.
Please observe the painted arrows on the lot surface to ensure vehicular and pedestrian safety. To exit, follow the arrows, loop around the east end of our lot, and return to the exit on 16th Street at the stop sign. The three-space ADA-only parking area is now accessible from Hamilton St. (A PA Blue Hang Tag is required).
Visit 1528 Construction Parking Updates for more information.